Amenity Water Management Ltd

Dredging a lake
Home
Restoration of an Eroded River Channel
Dredging Half a Moat Using Portadams
Gabion Stone Revetment with Bio-Engineering on Chalk Spring Brook
Creating Sand Martin and Kingfisher Nesting Habitat
River Habitat Improvement at Blenheim Palace
Oak dipping platform for school children
Piling for a boathouse and jetty on the Thames
Dredging a lake
Re-lining a large pond
Retaining topsoil on steep slopes
'Green' Steel Sheet Piling on the Thames
Restoring Islands in an Urban Lake
Geotextile soft revetments for eroded banks
Water Quality Improvement - Weed and Algae Management
Design and Construction
Dredging and Revetments

This private lake required dredging to improve water quality prior to stocking with trout. Ideally there was a field adjacent for the silt to be spread on keeping transport costs to a minimum and improving the soil quality.

murraymountainlake005r.jpg
The lake is drained and the water diverted.

murraydredge001r.jpg
The plant is delivered and dredging begins.

murraymountainlake007r.jpg
The trees surrounding the lake are thinned to enable access

murraydredge004r.jpg
Long reach excavators mean minimal access points

murrayredge003r.jpg
The silt is tipped on an adjacent field.

murraydredge002r.jpg
The silt is later spread and allowed to dry before being ploughed in to improve the soil.


All content © copyright 2006 AWM Ltd.
Hullbrook Farm Hullbrook Lane Shamley Green Surrey GU5 0TF. +44(0)1483 890666