| The dredger arrives on site |
The materials were moved to the islands and the revetments to form the new bank line installed. Three types of revetment
were used on the large island. A third was willow spiling, a third hazel faggot bundles with planted coir rolls and the last
third was a platform for the ducks constructed in oak. Backfilling behind the revetments was with silt dredged from the lake
and these areas were also planted with indigenous aquatic species.

|
| Work in progress on the large island |
|
 |

|
| and launches itself into the lake |

|
| The willow spiling section and part of the duck platform |
|