Amenity Water Management Ltd

Piling for a boathouse and jetty on the Thames
Home
Restoration of an Eroded River Channel
Dredging Half a Moat Using Portadams
Gabion Stone Revetment with Bio-Engineering on Chalk Spring Brook
Creating Sand Martin and Kingfisher Nesting Habitat
River Habitat Improvement at Blenheim Palace
Oak dipping platform for school children
Piling for a boathouse and jetty on the Thames
Dredging a lake
Re-lining a large pond
Retaining topsoil on steep slopes
'Green' Steel Sheet Piling on the Thames
Restoring Islands in an Urban Lake
Geotextile soft revetments for eroded banks
Water Quality Improvement - Weed and Algae Management
Design and Construction
Dredging and Revetments

A tired old single storey boathouse is to be replaced with a new boathouse and studio above along with planted bio-engineering revetments to replace asbestos piling, a new slipway and timber jetty.

hideawayhouse004r.jpg
Inside the old boathouse

marlow004r.jpg
The remains of the old boathouse

marlow001r.jpg
Demolition works begin

marlow007r.jpg
Asbestos sheets to be replced with bio-engineering

marlow011r.jpg
More asbestos and the old scaffold jetty to go

marlow017r.jpg
Piling continues and planting the new revetments starts

marlow023r.jpg
The somewhat smaller piles for the jetty

marlow015r.jpg
The piling frame is erected and the first pile driven

marlow018r.jpg
The view from the house. The smaller all terrain crane is for the jetty piling works

marlow025r.jpg
Piling for the new jetty


All content © copyright 2006 AWM Ltd.
Hullbrook Farm Hullbrook Lane Shamley Green Surrey GU5 0TF. +44(0)1483 890666