Amenity Water Management Ltd

Design and Construction
Home
Restoration of an Eroded River Channel
Dredging Half a Moat Using Portadams
Gabion Stone Revetment with Bio-Engineering on Chalk Spring Brook
Creating Sand Martin and Kingfisher Nesting Habitat
River Habitat Improvement at Blenheim Palace
Oak dipping platform for school children
Piling for a boathouse and jetty on the Thames
Dredging a lake
Re-lining a large pond
Retaining topsoil on steep slopes
'Green' Steel Sheet Piling on the Thames
Restoring Islands in an Urban Lake
Geotextile soft revetments for eroded banks
Water Quality Improvement - Weed and Algae Management
Design and Construction
Dredging and Revetments

From initial feasibilty studies through any planning and EA licensing requirements AWM can then discuss design ideas with the client and from that produce working drawings.
 
As a contractor AWM can carry out the bulk earthworks, associated civil engineering to construct water control mechanisms and installation of any pumped display requirements such as fountains. We can also supply and install the surrounding landscaping requirements.

Berkshire Golf Club Image
Pond Extension - Berkshire Golf Club

Contact us for details of more projects
on (0044) 0 1483 890666
 

Storm Water Channel Image
Construction of Storm Water Channel - Waltham Abbey